All Results (1,826)

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Quectel Antennas Embedded Antenna, Ceramic Patch, Adhesive & Soldering mount, 25 25 4 + 18 18 4 mm, Passive, GNSS L1&L5*1,, RoHS&REACH Compliant Non-Stocked Lead-Time 6 Weeks
Min.: 640
Mult.: 40
Quectel Antennas Embedded Antenna, Ceramic Patch, Adhesive & Soldering mount, 25 25 4 mm, Passive, GNSS L1*1,RoHS&REACH Compliant Non-Stocked Lead-Time 6 Weeks
Min.: 200
Mult.: 200

Quectel Antennas External, 1568 +/-10, GNSS L1&B1&G1 (active), Ceramic, 2000, SMA Male (center pin), Magnetic, 45.5 38 13.5
Non-Stocked Lead-Time 6 Weeks
Min.: 1,000
Mult.: 25
Quectel RF Cable Assemblies Embedded, 0-6000, Cable assembly, 100, -, SMA-female to IPEX ? Non-Stocked Lead-Time 6 Weeks
Min.: 200
Mult.: 200
Quectel Antennas External Antenna, Rubber, Terminal mount, 135 15.6 13mm, Dipole, 5G*1,SMA Male, IP67, RoHS&REACH Compliant Non-Stocked Lead-Time 6 Weeks
Min.: 500
Mult.: 25

Quectel Antenna Accessories Embedded, 0-6000, Cable assembly, 300, -, SMA-female to IPEX ? Non-Stocked Lead-Time 6 Weeks
Min.: 200
Mult.: 200
Quectel Multiprotocol Modules Wi-Fi 5, 802.11a/ b/ g/ n/ ac, 1 1, 2.4/ 5 GHz dual-band, Bluetooth 5.0 (CYW43455) Non-Stocked Lead-Time 16 Weeks
Min.: 500
Mult.: 500
: 500

Quectel GNSS / GPS Modules Single band, 3 GNSS, 10Hz, Automotive AEC-Q104 (ST Teseo III) Non-Stocked Lead-Time 24 Weeks
Min.: 250
Mult.: 250
: 250

Quectel GNSS / GPS Modules Single band, 4 GNSS, Timing, 10MHz output, w/ LNA (ST Teseo V)
Non-Stocked Lead-Time 24 Weeks
Min.: 1
Mult.: 1
: 200

Quectel GNSS / GPS Modules Dual band L1/L5, 3 GNSS, ASIL B, w/ LNA, requires external PE, Automotive (ST Teseo V) Non-Stocked Lead-Time 27 Weeks
Min.: 250
Mult.: 1

Quectel GNSS / GPS Modules Dual band L1/L5, 3 GNSS, 4 wheels ADR/UDR, w/ LNA, Automotive (ST Teseo V)
Non-Stocked Lead-Time 24 Weeks
Min.: 250
Mult.: 250
: 250

Quectel GNSS / GPS Modules Dual band L1/L5 or L1/L2, 3 GNSS, GNSS RAW, w/ LNA, 105 degrees, Automotive (ST Teseo V)
Non-Stocked Lead-Time 24 Weeks
Min.: 250
Mult.: 250
: 250

Quectel GNSS / GPS Modules Dual band L1/L5, 3 GNSS, GNSS + IMU RAW, w/ LNA, 105 degrees, Automotive (ST Teseo V) Non-Stocked Lead-Time 24 Weeks
Min.: 250
Mult.: 250
: 250

Quectel GNSS / GPS Modules Dual band L1/L5, 3 GNSS, RTK rover + 4 wheels ADR (requires external correction), w/ LNA (ST Teseo V) Non-Stocked Lead-Time 24 Weeks
Min.: 250
Mult.: 250
: 250

Quectel Mobile Modules cloud enabled, LTE Cat 4 Global (4G + 3G), 1Gb+1Gb (128MB+128MB), M.2 format Non-Stocked Lead-Time 24 Weeks
Min.: 150
Mult.: 150
Quectel Multiprotocol Modules Cat 6 Non-Stocked Lead-Time 32 Weeks
Min.: 250
Mult.: 250
: 250

Quectel Multiprotocol Modules Cat 6
Non-Stocked Lead-Time 32 Weeks
Min.: 250
Mult.: 250
: 250

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs)
Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs)
Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Modules Longevity till 2030, Linux version (EAU >2000pcs) Non-Stocked Lead-Time 16 Weeks
Min.: 600
Mult.: 200
: 200

Quectel Multiprotocol Development Tools
Non-Stocked Lead-Time 28 Weeks
Min.: 1
Mult.: 1